Vision Iowa, cat & recat projects by County As of June 2016


Applicant: City of Story City



Download 0.67 Mb.
Page9/10
Date19.10.2016
Size0.67 Mb.
#3757
1   2   3   4   5   6   7   8   9   10
Applicant: City of Story City

Project Name: Story City Swimming Pool

Date of Award: 5/13/2015
Total Project Cost: $2,572,876
Amount Requested: $86,530
Amount Awarded: $86,530
Project Description: This project includes the construction of a swimming pool with two water slides, two diving boards, a spray zone area for toddlers, lap swimming, lounge areas, a new bathhouse and concession stand.
Applicant: City of Story City & Story City Historical Society

Project Name: Carriage House Museum

City: Story City (Population 3,228)

Date of Award: 11/14/2007

Total Project Cost: $371,522

Amount Requested: $45,780

Amount Awarded: $45,780

Project Description: This project includes the construction of a new building next to the historic house known as the Bartlett House Museum. The main level of the building will be used for exhibits that tell the story of the people and events that made this community and surrounding area. The building has a full basement for storage, conservation and construction of displays. A second level loft will provide space for research, genealogy exploration and special exhibits. The building environment will provide conditions appropriate for archival-safe storage and displays to ensure the preservation of the collections. The main level will offer a community room for public events, meetings and classes.


Applicant: City of Story City

Project Name: Story City Community Recreation Center

City: Story City (Population 3,228)

Date of Award: 2/9/2005

Total Project Cost: $2,238,310

Amount Requested: $450,000

Amount Awarded: $200,000

Project Description: This project will construct a 15,060 Community Recreation Center facility in Story City. The building will contain a gymnasium and a walking/running track.


Applicant: City of Slater

Project Name: Slater Area Swimming Pool

City: Slater (Population 1,306)

Date of Award: 7/14/2004

Total Project Cost: $1,092,400

Amount Requested: $93,000

Amount Awarded: $83,500

Project Description: The Slater Area Swimming Pool will replace the existing 30 year old pool. The facility will include the pool, a combination concession area and bathhouse and water feature amenities.


Applicant: City of Nevada

Project Name: SCORE Park Development

City: Nevada (Population 6,658)

Date of Award: 11/30/2001

Total Project Cost: $7,283,000

Amount Requested: $486,000

Amount Awarded: $450,000

Project Description: Developed on 58 acres, Nevada’s SCORE Park is a $7.3 million initiative that includes an aquatic center, playgrounds, soccer fields, multi-use fields, tennis courts, a pavilion and parking/restroom/concession facilities. Local leaders say the complex will improve local quality of life and attract visitors to the community.


Applicant: City of Ames

Project Name: Connect Iowa

City: Ames (Population 50,731)

Date of Award: 9/17/2001

Total Project Cost: $6,472,250

Amount Requested: $3,201,125

Amount Awarded: $1,500,000

Project Description: This project involves land acquisition, prairie-wetland ecosystem restoration, and development of a regional park with trail system called the Ames Nature Preserve in an area north of Ames known as Hallett’s Quarry.


Tama

Applicant: City of Traer

Project Name: Wind Up with a New Traer Pool

Date of Award: 6/8/2016

City: Traer (Population 1,703)

Total Project Cost: $3,047,550

Amount Requested: $100,000

Amount Awarded: $100,000

Project Description: The new pool will be ADA compliant with zero depth entry. New concession and mechanical buildings will be constructed, as well as new deck and shaded seating area. Amenities include a large slide, a toddler slide, a diving board, and water sprinkler features.
Applicant: City of Dysart

Project Name: Remembering our Past, Renovating for the Future

City: Dysart (Population 1,379)

Date of Award: 7/9/2014

Total Project Cost: $880,000

Amount Requested: $176,000

Amount Awarded: $176,000

Project Description: This project includes the construction of a 24-foot open air pavilion in Dysart City Park as well as renovations to the existing Community Building. Specific renovations include an addition to the west side of the building, elevator, updates to existing restrooms, a small serving area for the main hall, upper level air conditioning, updates to the current kitchen, fire suppression hood in the kitchen and fire alarms throughout the building.


Applicant: Wieting Opera House Company of Toledo, Iowa

Project Name: Wieting Theatre and Opera House Restoration Project

City: Toledo (Population 2,539)

Date of Award: 1/12/2011

Total Project Cost: $1,124,442

Amount Requested: $218,765

Amount Awarded: $218,000

Project Description: This project includes the major renovation of the Wieting Theatre. Specific components include, new seating, new electrical systems, a new sprinklers system, an addition the restroom facilities, a new sound system, new auditorium and stage lighting, new decorations and murals, repairs to the flooring and basement, repairs to heating, cooling, and plumbing systems, and repairs to the stage and projection system.


Applicant: City of Gladbrook

Project Name: Gladbrook Fitness and Wellness Center

City: Gladbrook (Population 1,015)

Date of Award: 3/14/2007

Total Project Cost: $528,000

Amount Requested: $205,000

Amount Awarded: $150,000

Project Description: The Gladbrook Fitness and Wellness Center is a multi-purpose facility that will include a new 24’ X 94’ facility equipped with 17 pieces of new exercise equipment. The new building will be attached to the existing Gladbrook Reinbeck Middle School adjacent to the indoor swimming pool area. The project will include updates to the existing restroom and locker room facilities associated with the pool and also provide new recreational enhancements to the existing indoor swimming pool including a new slide and replacement of the diving board.


Applicant: City of Tama

Project Name: Tama Toledo Family Aquatic Center

City: Tama (Population 2,731)

Date of Award: 9/8/2004

Total Project Cost: $3,070,080

Amount Requested: $610,080

Amount Awarded: $93,000

Project Description: In partnership, the cities of Tama and Toledo plan to construct a new state-of-the-art pool facility with zero-depth entry, pleasant pool surroundings, sun shelters, active water features, landscaping, sun bathing areas and food service facilities.


Applicant: Toledo Public Library Foundation

Project Name: Toledo Public Library Expansion & Renovation

City: Toledo (Population 2,539)

Date of Award: 10/8/2003

Total Project Cost: $827,688

Amount Requested: $362,700

Amount Awarded: $165,000

Project Description: The Toledo Library will complete an expansion and restoration to the current library facility. The plan includes adding a 6,100 square foot addition to the current building and provides plans to preserve the current historical structure. The plan recognizes the need for handicap accessibility, more space, new technologies, energy efficiency, and effective programming and services for the community.


Applicant: City of Dysart

Project Name: Dysart Family Aquatic Center

City: Dysart (Population 1,303)

Date of Award: 2/12/2003

Total Project Cost: $1,672,815

Amount Requested: $200,000

Amount Awarded: $95,000

Project Description: This project includes construction of the Dysart Family Aquatic Center including handicapped accessable restrooms, a food court, deck area, and several play features and amenities.


Applicant: Traer Public Library Foundation

Project Name: Traer Public Library Expansion and Cultural Center

City: Traer (Population 1,594)

Date of Award: 7/10/2002

Total Project Cost: $1,562,000

Amount Requested: $250,000

Amount Awarded: $150,000

Project Description: Constructed between 1915 and 1916, Traer’s public library is not handicap accessible, is overcrowded, and needs updated heating, cooling and technology systems. The Traer Public Library Foundation plans to renovate the building by adding a street level entrance, an elevator and expanding the building to double its present space. The lower level will offer a cultural center, meeting and performance space.


Applicant: City of Gladbrook

Project Name: Gladbrook City Centre, Theatre and Matchstick Marvels Tourist Center

City: Gladbrook (Population 1,015)

Date of Award: 9/17/2001

Total Project Cost: $811,800

Amount Requested: $241,000

Amount Awarded: $241,000

Project Description: This project calls for the construction of a multi-use facility that will house a movie theater, performance stage and conference center. The complex will also include the Matchstick Marvels Tourist Center that will highlight the work of Gladbrook resident Pat Acton, who builds wooden models using matchsticks.


Taylor
Applicant: City of Lenox

Project Name: Lenox Community Center

City: Lenox (Population 1,401)

Date of Award: 10/13/2010

Total Project Cost: $584,867

Amount Requested: $131,475

Amount Awarded: $131,300

Project Description: This project will include a 7,200 square foot building located on the southwest corner of Locust and Dallas streets. The facility will contain a large and a small meeting room, a kitchen, and parking lot with 68 spaces.


Union

Applicant: City of Creston

Project Name: Creston Skatepark

City: Creston (Population 7,597)

Date of Award: 5/9/2007

Total Project Cost: $381,949

Amount Requested: $61,816

Amount Awarded: $50,000

Project Description: This project will include the construction of a 10,000 square foot skate park to be located in McKinley Park. Vertical infrastructure components will include soil work, concrete work, utilities, lighting, fencing, signage, landscaping, and skate park obstacles.
Applicant: Union County Board of Supervisors

Project Name: Three Mile Lake Lodge Phase 3

City: Creston (Population 7,597)

Date of Award: 5/9/2001

Total Project Cost: $366,700

Amount Requested: $42,200

Amount Awarded: $42,200

Project Description: Construction of the Three Mile Lake Lodge is the third phase of a four-phase recreation area development plan for Three Mile Lake. The multi-purpose lodge will include a kitchen, restroom facilities and a full basement. Landscaping, handicap accessibility and an access road are also components of the project.


Van Buren


Applicant: City of Birmingham

Project Name: Birmingham Park Shelter Project

City: Birmingham (Population 423)

Date of Award: 7/9/2008

Total Project Cost: $152,350

Amount Requested: $45,000

Amount Awarded: $45,000

Project Description: This project will replace the existing facility with a 2,508-square foot building. Amenities will include two handicapped-accessible restrooms, a kitchenette, dining/reception area and a freeze-proof drinking fountain outside.
Wapello

Applicant: Wapello County Trails Council, Inc. and the City of Ottumwa

Project Name: Wapello County Trails Council Highway 34 Underpass

City: Ottumwa (Population 24,806)

Date of Award: 11/20/2014

Total Project Cost: $654,375

Amount Requested: $137,875

Amount Awarded: $125,000

Project Description: This connecting underpass will be a part of the existing 10-mile trail system in Ottumwa. It will expand the existing, unique recreational and entertainment assets in Ottumwa by providing a safe crossing to an area along the Des Moines River that will be utilized for hosting large outdoor concerts and events.
Applicant: City of Ottumwa

Project Name: Beach Ottumwa Enhancement

City: Ottumwa (Population 24,998)

Date of Award: 8/11/2010

Total Project Cost: $400,000

Amount Requested: $98,000

Amount Awarded: $98,000

Project Description: This project includes enhancements to the existing Beach Ottumwa facility; specifically a new curly waterslide and renovation of the children’s play area.


Applicant: City of Eldon

Project Name: American Gothic House Visitors / Educational Center

City: Eldon (Population 998)

Date of Award: 11/12/2003

Total Project Cost: $340,000

Amount Requested: $170,000

Amount Awarded: $150,000

Project Description: The state's investment will assistant the third phase of this project, construction of a visitors/education center. The facility will serve as the trailhead for the Green Beltway, a trail and park system that extends from the "American Gothic House" to downtown Eldon. The visitor’s center will also educate the public on artist Grant Wood’s life, and will exhibit parodies of his paintings, offer photographic opportunities of the "American Gothic House" and offer hands-on and interactive educational classes in the meeting room. The visitor’s center staff will also provide travelers with information about southeast Iowa and the entire state.


Applicant: City of Ottumwa & Bridge View Center, Inc.

Project Name: Bridge View Center – Vision Iowa Project

City: Ottumwa (Population 24,998)

Date of Award: 12/12/2001

Total Project Cost: $20,500,000

Amount Requested: $8,500,000

Amount Awarded: $7,500,000

Project Description: A project that began as a grass roots initiative in 1997, the Bridge View Center is an events center that will serve southeast Iowa from its location near the Des Moines River. The historic Ottumwa Coliseum will be renovated and expanded to create a multi-purpose exhibition hall. Adjacent to this facility will be a new performing arts center, meeting rooms, a visual arts gallery, public spaces, and a reception hall.


Warren

Applicant: City of Indianola

Project Name: Indianola Wellness Center

City: Indianola (Population 14,156)

Date of Award: 4/11/2012

Total Project Cost: $14,281,158

Amount Requested: $481,244

Amount Awarded: $481,244

Project Description: This project includes the construction of a 55,000-square-foot facility with a gymnasium, eight-lane competitive lap and recreational pools with bleacher seating for 600, wellness areas, locker rooms, program studio, racquetball court and social spaces.
Applicant: City of Carlisle

Project Name: The Carlisle Nature Trail Loop

City: Carlisle (3,725)

Date of Award: 10/12/2011

Total Project Cost: $2,573,822

Amount Requested: $519,965

Amount Awarded: $460,000

Project Description: This project includes the construction of approximately 3.3 miles of trail within the city of Carlisle. The trail will measure 10 feet in width and will be separated from the street.


Applicant: City of Carlisle

Project Name: Carlisle Area Family Aquatic Center

City: Carlisle (Population 3,497)

Date of Award: 11/10/2004

Total Project Cost: $1,853,513

Amount Requested: $102,800

Amount Awarded: $100,000

Project Description: This project includes construction of a 5,530-square foot pool vessel with a zero-depth entry area including floor geysers, a frog slide and a raindrop, a six-lane 25-yard long swimming area including provisions for a drop slide, an open flume waterslide and a 1-meter diving board and a 2,823-square foot bathhouse, all to be constructed on a city owned property.


Applicant: City of Norwalk

Project Name: Norwalk-McAninch Sports Complex-Irrigation/Parking Program

City: Norwalk (Population 6,884)

Date of Award: 11/10/2004

Total Project Cost: $183,700

Amount Requested: $64,850

Amount Awarded: $50,000

Project Description: The Norwalk-McAninch Sports Complex project includes the installation of an irrigation system for existing soccer fields and baseball/softball fields and development of an overflow parking area.


Applicant: Community Projects, Inc.

Project Name: The Dr. Adeline L. McCormick-Ohnemus Community Center

City: Milo (Population 839)

Date of Award: 7/11/2002

Total Project Cost: $185,568

Amount Requested: $25,000

Amount Awarded: $20,000

Project Description: Upon completion of this project, the facility will serve as a multi-purpose community center that will include a gymnasium. The community center will be available for a variety of community events and gatherings.


Applicant: City of Indianola

Project Name: Indianola Skate Park

City: Indianola (Population 14,156)

Date of Award: 3/13/2002

Total Project Cost: $418,000

Amount Requested: $40,000

Amount Awarded: $40,000

Project Description: Development of a skate park facility


Washington

Applicant: Washington Community Betterment Foundation

Project Name: Washington Area Performing Arts and Events Center

City: Washington (Population 7,266)

Date of Award: 11/20/2014

Total Project Cost: $7,041,249

Amount Requested: $900,000

Amount Awarded: $800,000

Project Description: This project includes the construction of a 700-seat handicap-accessible auditorium located next to the Washington High School.
Applicant: City of Kalona

Project Name: Downtown Kalona Revitalization

City: Kalona (Population 2,293)

Date of Award: 6/9/2010

Total Project Cost: $2,844,269

Amount Requested: $547,419

Amount Awarded: $108,000

Project Description: This project includes renovating the streetscape of 5th Street and Avenue B, 4th Street to 6th Street Alley, and the Community Center Parking Lot. Specific components of the streetscape will include: storm water management; new energy efficient street lighting; ADA compliant street access; artistic quilt designs; wayfinding signage; plantings and landscaping; benches; and street furniture.


Applicant: Wellman Area Foundation

Project Name: Parkside Activity Center

City: Wellman (Population 1,393)

Date of Award: 11/14/2007

Total Project Cost: $5,300,875

Amount Requested: $1,060,175

Amount Awarded: $800,000

Project Description: The Parkside Activity Center will be a 38,400-square foot, two-level facility. This facility will offer health and fitness areas, an indoor track, community room space, and licensed child care on site.


Applicant: City of Washington

Project Name: Washington Free Public Library

City: Washington (Population 7,047)

Date of Award: 7/11/2007

Total Project Cost: $5,526,046

Amount Requested: $1,200,000

Amount Awarded: $700,000

Project Description: The proposed project includes the construction of a new 30,000-square foot library to be located on the south side of the square.


Applicant: Washington County Conservation Board

Project Name: Washington County Conservation Education Center

City: Washington (Population 7,047)

Date of Award: 5/8/2002

Total Project Cost: $660,000

Amount Requested: $175,000

Amount Awarded: $75,000

Project Description: This project includes the construction of a new 5,300-square-foot facility that will serve as a Conservation Education Center. A kitchen, laboratory, library, offices, displays, and a conference hall will make up the facility.


Wayne

Applicant: City of Humeston

Project Name: Revitalize Humeston

City: Humeston (Population 543)

Date of Award: 3/14/2007

Total Project Cost: $957,352

Amount Requested: $311,069

Amount Awarded: $275,000

Project Description: The three major components of this project include construction of a new building for the public library, beautification of the business district streetscape, and replacement of outdated playground equipment in the park. The new library will feature plenty of room for the collection of library materials, a designated technology center with additional public access to computers, improved children’s area, and meeting room for use by public and private groups. The streetscape will feature new light fixtures along Broad Street, an ornamental clock and sidewalk and street reconstruction. These improvements will also allow the business district to become ADA compliant. The park is located across the street from the site of the new library. New playground equipment is needed to replace the outdated equipment.
Applicant: City of Corydon

Project Name: Wayne County Prairie Trails Family Aquatic Center

City: Corydon (Population 1,591)

Date of Award: 2/12/2003

Total Project Cost: $1,250,000

Amount Requested: $250,000

Amount Awarded: $95,000

Project Description: The City of Corydon plans to replace their nearly 30-year-old existing pool facility with a family aquatic center. The project is comprised of the main pool facility including piping and decking, bathhouse, and concession area. The aquatic center will offer recreational swimming, water exercise, physical rehabilitation and be a social gathering destination for families.


Webster

Applicant: City of Fort Dodge

Project Name: Fort Dodge and Webster County Trail Plan

City: Fort Dodge (Population 26,309)

Date of Award: 11/10/2010

Total Project Cost: $6,766,000

Amount Requested: $1,356,373

Amount Awarded: $1,200,000

Project Description: This project includes the construction of 15 individual recreational trail projects, which together comprise the first phase of a comprehensive trail network within Fort Dodge and Webster County. The trail projects include a combination of constructed hard surface trail, sidewalk installations, on-street painting and striping. Trail signage, trailheads, and trail amenities such as benches, bike racks, and informational kiosks are also included.
Applicant: City of Fort Dodge

Project Name: Harlan & Hazel Rogers Sports Complex

City: Fort Dodge (Population 26,309)

Date of Award: 7/10/2002

Total Project Cost: $6,317,683

Amount Requested: $2,833,000

Amount Awarded: $1,100,000

Project Description: This project includes the expansion of the Harlan and Hazel Rogers Sports Complex, which is made up of seven softball diamonds, one baseball field and nine soccer fields. Eighteen additional acres will be acquired, and four mini-major league fields for little league baseball will be constructed. The project also calls for enhanced tile and drainage lines, enhanced concession and restroom facilities, and improved parking lot entrances and exits. Aesthetic improvements are also included in the project.


Winnebago

Applicant: City of Buffalo Center

Project Name: Heritage Town Center

City: Buffalo Center (Population 963)

Date of Award: 5/12/2010

Total Project Cost: $549,720

Amount Requested: $106,756

Amount Awarded: $100,000

Project Description: This project includes the construction of a 9,600-square-foot structure that will house a museum space, banquet hall, kitchen area, bathrooms, and storage areas.
Applicant: Winnebago County Historical Society

Project Name: Heritage Park of North Iowa



Download 0.67 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   10




The database is protected by copyright ©ininet.org 2024
send message

    Main page