Construction
|
General traffic safety, safety of wild animals
|
On site, around site
|
Complaints from neighbors, traffic monitoring
|
Regularly during construction, daily or
as appropriate
|
Safety of traffic participants, workers and PA personnel, safety of animals
|
Minor/ included in construction costs
|
Construction Contractor, Site Overseer/
Suprevisor, Rangers
|
Construction
|
Dust generation
|
On site, around site
|
Visual inspection, irritation of respiratory system
|
Daily or as required during construction works
|
Minimization of dust dissipation in the area, minimization of irritation of respiratory systems of thr workers, PA personnel and animals
|
Minor/ included in construction costs
|
Construction Contractor, Site Supervisor
|
Construction
|
Anxiety of wild animals due to nois and vibrations generated
|
On site, around site
|
Aural inspection, regular patrolling through the area
|
Daily or as required during construction works
|
Minimization of induced anxiety in animals
|
Minor/ included in construction costs
|
Construction Contractor, Site Supervisor, Rangers
|
Construction
|
Aesthetics of the area
|
On site
|
Visual inspection
|
During construction works U toku izvođenja radova
|
In order to minimize negative impacts on the aesthetics, and induced anxiety in animals
|
Minor/ included in construction costs
|
Construction Contractor, Site Supervisor
|
Construction
|
Waste management quality
|
On site
|
Visual inspection, disposal records or receipts from landfills or from authorized hazardous waste operators
|
Regular daily control
|
Protection of soil, groundwater, surface water, aesthetic reasons, prevention of negative impacts on flora and fauna
|
Included in construction costs
|
Construction Contractor, Site Supervisor, Rangers
|
Construction
|
Leaks/spills of fuel, lubricants, coolants, and other harmfrul liquids
|
On and around site.
|
Visual inspection.
In case of frequent and substantial spills or leaks, detailed lab analysis of the contaminated media and groundwater should be conducted
|
Visual inspection daily during works.
Lab analysis as required.
|
Protection and prevention of environmental pollution,
workers safety
|
Should be included in construction costs; cost of additional lab testing: approximately 500-1000 KM
|
Construction Contractor, Site Supervisor
|
Construction
|
Air emissions from equipment and vehicles
|
On site, around site
|
Sensory inspection,
air quality meters
|
Weekly during construction
|
Protection of biodiversity, health of workers and PA personnel, air quality protection
|
Portable air emission monitors: approximately 3000 KM
|
Construction Contractor, Site Supervisor
|
Construction
|
Land erosion and sedimentation
|
On site
|
Geotechnical investigation, visual inspection
|
Daily visual inspection during works
|
Protection of soil, surface water, groundwater, workers safety, construction safety
|
Minor; investigation cost: approx.
500-1500 KM
|
Construction Contractor, Site Supervisor, Rangers
|
Construction
|
Hydrologic characteristics of the site
|
On site, around site
|
Visual inspection
|
Regularly during works
|
Protection of habitats and biodiversity
|
Minor
|
Construction Contractor, Site Supervisor
|
Construction
|
Landslides
|
On site
|
Visual inspection
|
As required during works
|
Protection of configuration of terrain, protection of habitats, general safety
|
Minor
|
Construction Contractor, Site Supervisor, Rangers
|
Construction
|
Cut down and damaged trees/vegetation restoration
|
On site, around site
|
Visual inspection, photographs prior to start up of construction works
|
Before and after construction works
|
Natural resources preservation, aesthetic reasons
|
Minor/ included in construction costs
|
Construction Contractor, Site Supervisor
|
Construction
|
Alterations/ perturbations of habitats
|
On site, around site
|
Visual inspection
|
Daily during works
|
Preservation of habitats
|
Minor/ included in construction costs
|
Construction Contractor, Site Supervisor, Rangers
|
Construction
|
Chance findings of graves, archeological items, cultural heritage items
|
On site, around site
|
Visual inspection
|
Regularly during construction works
|
Protection of cultural heritage, idenitification/location of missing persons
|
Negligible
|
Construction Contractor, Site Supervisor
|
PA Operation
|
Distrurbance, injuries and running over of animals, alterations in biodiversity, improper waste disposal, increased wastewater quantities
|
On site, around site
|
Visual inspection
|
Regularly in accordance with the PA Management Plan, plus as required during intensified visits
|
Biodiversity protection, prevention of environmental pollution
|
Included in regular operational costs
|
PA Personnel/ Rangers
|
PA Operation
|
Pollution of air, watercourses,
damages to flora and fauna
|
On site, around site
|
Visual inspection, air quality meters
|
Regularly in accordance with the PA Management Plan
|
Prevention of environmental pollution, biodiversity protection
|
Included in regular operational costs; cost of installation of groundwater monitoring wells: approx. 1000 KM/piece
|
PA Personnel/ Rangers
|
PA Operation
|
Illegal activities inside PA
|
On site, around site
|
Visual inspection
|
Regularly in accordance with the PA Management Plan
|
Environmental and biodiversity protection
|
Included in regular operational costs
|
PA Personnel/ Rangers
|
PA Operation
|
Standard of living of local population
|
On site, around site
|
Consultations with the residents in accordance with the Process Framework for Participation of Local Population
|
Prior to start up of any project activities, and later on during PA operation
|
Protection of standard of living of local population
|
Included in project budget
|
Project Implementation Unit, Rangers, Monitoring Committee
|
PA Operation
|
Various environmental loads caused by induced development of settlements
|
On site, around site
|
Visual inspection, groundwater quality monitoring
|
Quarterly
|
Preservation of environment and biodiversity
|
Included in regular operational costs
|
PA Personnel/ Management, Rangers
|