Fuzhou World Bank Financed Projects Nanjiang Binlu, Phase-ii project of the Third Ring Road and Kuiqi Bridge environmental impact report


Environment functional areas and implementation standard within the assessment area



Download 3.93 Mb.
Page4/48
Date13.07.2017
Size3.93 Mb.
#23223
1   2   3   4   5   6   7   8   9   ...   48

1.7 Environment functional areas and implementation standard within the assessment area

1.7.1 Noise environment functional area

In accordance with relevant specifications as stated in the《Fuzhou City Environment Planning》, the functional area within the project noise environment assessment range is mainly divided into two categories. Category-B area standard as set in the 《GB3096-93》 shall apply to the noise environment quality. Refer to Table 1.7-1 for environmental noise standard values at those functional areas.


Table 1.7-1 Assessment standard for noise environment quality Unit: dB(A)

Road

Type

Day

Night

Remark

Nanjiang Binlu

2

60

50

Category-B area standard applies to most of the road sections

4

70

55

Category-D area standard applies to Cangqianlu (1.1km) between Sanxiangzhou Bridge and Jiefang Bridge

Phase-II of the Third Ring Road

2

60

50

Category-B area standard applies

Kuiqi Bridge

2

60

50

Category-B area standard applies



1.7.2 Air environment functional area

In accordance with relevant specifications as stated in the《Fuzhou City Environment Planning》, the Category-B standard as set in the《Environment Air Quality Standard (GB3095-1996)》(Revised edition)》 shall apply to all sections within the environmental air assessment area of Nanjiang Binlu, the Phase-II project of the Third Ring Road and Kuiqi Bridge. Refer to Table 1.7-2 for concrete standard values.


Table 1.7-2 Environment air quality standard values unite: mg/m3

Monitoring factor

Value-taken time

Limited concentrate value

Standard

CO

1h

10.00

《Environment Air Quality Standard (GB3095-1996)》 Category-B standard

NO2

1h

0.24

PM10

24h

0.15



1.7.3 Water environment functional area and implementation standard

In accordance with 《Fuzhou City Environment Planning》, the Category-C standard as set in the《Surface Water Environment Quality Standard (GB3838-2002)》 shall apply to Beigang river section along Nanjiang Binlu, river section where Kuiqi Bridge crosses and Nangang river section close to the Phase-II of the Third Ring Road.


1.8 Emission Standard


  1. 《Limited Emission Value and Measuring Method of the Light-duty Vehicle (Ⅰ)》(GB18352.1-2001);

  2. 《Limited Emission Value and Measuring Method of the Light-duty Vehicle (Ⅱ)》(GB18352.2-2001);

  3. 《Limited Emission Value and Measuring Method of the Automotive Compression Ignition Engine》(GB17691-2001) the second time period;

  4. 《Limited Emission Value and Measuring Method of the Automotive Ignition Engine and Vehicle Fitted with Ignition Engine》(GB14762-2002);

  5. 《Limited Emission Value and Measuring Method (idling method) of the Motorcycle and Trail bike》(GB14621-2002);

  6. 《Limited Noise Value of the Motorcycle and Trail bike》(GB16169-1996);

  7. 《Limited Emission Value and Measuring Method (working method) of the Motorcycle》(GB14622-2002);

  8. 《Limited Emission Value and Measuring Method (working method) of the Trail bike》(GB18176-2002);

  9. 《Limited Noise Value of the Construction Site Boundary (GB12523-96)》;

  10. 《Standard Limited Noise Value of the Construction Site Boundary》(GB12523-96) limited noise value at various construction phases;

  11. 《Sewage Comprehensive Drainage Standard》(GB8978—96) Class-II standard.

2Project Description and Engineering Analysis

Status and Role of the Phase-II Project Of the Third Ring Road and Nanjiang Binlu in the Traffic Planning of Fuzhou


Nanjiang Binlu is situated on the south bank of Beigang of The Minjiang River, Fuzhou. The Phase-II of the Third Ring Road crosses Nantaidao Island from southwest to northeast. Kuiqi Bridge is the key project of the proposed east section of the Third Ring Road crossing Minjiang River. The strike and location of the two roads and one bridge are shown in Fig. 2.1-1.
Nanjiang Binlu Project is situated inside the flood bulkhead line on the south bank of Beigang of the Minjiang River and is the North Ring of the proposed Nantaidao Island Ring Road. It starts from Cangqianlu of the south interchange of Sanxianzhou Minjiang Bridge, crosses Jiefang Bridge, No.2 Minjiang Bridge, N0.3 Minjiang Bridge, proposed Qianheng Bridge, ends at Qiannanlu. Nanjiang Binlu is the North Ring Road of Nantaidao Island Road, and is a road along the river with integrated leisure, sightseeing and traffic. Thus its construction will not only perfect the road network of Nantaidao Island, but also enhance the density of the sub-trunk road network of Fuzhou urban area as well as meet the needs of the residents in circumferential areas.
The Phase-II Project of the Third Ring Road crosses Nantaidao Island from southwest to northeast, is the turbo channel connecting University Town, Jinshan (Jianxin), Gaishan zones in urban area. The Phase-II Project of the Third Ring Road starts from the north end of the proposed Wanbian Bridge, runs along south side of Yixu Airport, crosses Fuxialu, Fuqian Expressway, and ends at the south end of the proposed Minjiang Kuiqi Bridge. Construction of the Phase-II Project of the Third Ring Road will be helpful to development and construction of land in new areas and to promotion of transportation guiding city development, as well as will have enormous significance in promoting development and construction in Cangshan area and even the whole Nantaidao Island, improving investment environment, promote development of urban economy, and exerting the role of Fuzhou as the provincial capital city. Therefore, the construction of the Phase-II Project of the Third Ring Road will meet the need for implementation of the strategy “expansion in the east, extension in the south and exploitation in the west”.
For construction of Kuiqi Bridge, a new bridge crossing the Minjiang River downstream has completed, which reduces greatly the distance of south to north and makes the traffic more shortcut and speedy. At the same time, combined with the airport highway, the project not only reduces the distance from Changle Airport to the area along the expressway to the city center, but also gives an additional outlet to eastern part of Fuzhou city. According to traffic plan to perfect the city center road network, Kuiqi Bridge is the key project of the proposed east section of the Third Ring Road crossing Minjiang River. Construction of the project will not only perfect the Third Ring Road, but also effectively promote the construction of the road network along the Third Ring Road and perfect the road network structure of Fuzhou city. Based on the project, Gushan zone may reconstruct its road network and streamline the internal roads. At the same time, the project radiates to the whole Nantaidao Island and connects the road network of Nantaidao Island and those of Gutai, Gushan and Mawei as a whole. Therefore the proposed project is an urgent need for perfecting the road network of the urban area.



Download 3.93 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   48




The database is protected by copyright ©ininet.org 2024
send message

    Main page