D. Sector and Theme Codes





Original

Actual

Sector Code (as % of total Bank financing)







Central Government (Central Agencies)

4

4

Irrigation and Drainage

94

94

Sanitation

1

1

Waste Management

1

1










Theme Code (as % of total Bank financing)







Decentralization

13

13

Participation and civic engagement

25

25

Rural policies and institutions

13

13

Rural services and infrastructure

25

25

Water resource management

24

24



E. Bank Staff


Positions

At ICR

At Approval

Vice President:

Hafez M.H. Ghanem

Christiaan J. Poortman

Country Director:

Asad Alam

Emmanuel Mbi

Practice Manager/Manager:

Steven N. Schonberger

Narasimham Vijay Jagannathan

Project Team Leaders:

Bekele Debele Negewo

Abdulhamid Azad



Jose Simas

ICR Team Leader:

Heba Yaken Aref Ahmed




ICR Primary Author:

Heba Yaken Aref Ahmed





F. Results Framework Analysis

















Project Development Objectives (from Project Appraisal Document)

The overall project objective is to assist the Borrower in improving the management of irrigation and drainage in the project area in order to increase the efficiency of irrigated agriculture water use and services.


  1. PDO Indicator(s)

Indicator

Baseline Value

Original Target Values (from approval documents)

Formally Revised Target Values

Actual Value Achieved at Completion or Target Years




Indicator 1:

Water productivity (kg/m3) increase for main crops (wheat, cotton, rice, maize and berseem) (%)




Value

0

n.a.

20%

15%




Date achieved

January 2006

03/31/2014

03/31/2014

03/31/2016




Comments

Revised with 2014 restructuring to improve original wording (Volume of water used for given level of agricultural production [m3/ha/crop cycle])

Partially achieved (75% of target)






Indicator 2:

Difference between land productivity (t/ha) between head- and tail- end farmers (%)




Value

n.a.

n.a.










Date achieved

January 2006

03/31/2014










Comments

Dropped with 2014 restructuring in favor of Indicator 5 to assess equity of distribution




Indicator 3:

Value of land (compared with non-project neighboring command area)




Value

n.a.

n.a.










Date achieved

January 2006

03/31/2014










Comments

Dropped with 2014 restructuring




Indicator 4:

Irrigation Costs (EGP/1000 m3)




Value

Pumping: EGP 50/1,000 m3

Labor: EGP250/1,000 m3



n.a.

100

150




Date achieved

January 2006

03/31/2014

March 2014

March 2016




Comments

Introduced with 2014 restructuring

Partially achieved (75% of target) as switching from diesel pumps to electrical units, which would have generated reduction in pumping costs, was only partially carried out






Indicator 5:

Ratio of Water Availability (in m3/hour) measured at head and tail (%)




Value

0

n.a.

75%

75%




Date achieved

January 2006

03/31/2014

March 2014

March 2016




Comments

Introduced with 2014 restructuring instead of Indicator 2 to assess equity of distribution

Achieved (100% of target)






Indicator 6:

Area provided with improved irrigation and/or drainage services (ha)




Value

0

n.a.

193,750

(490,000 feddan)



193,750

(490,000 feddan)






Date achieved

01/31/2006

03/31/2014

03/31/2014

03/31/2016




Comments

Introduced with 2014 restructuring

Achieved (100% of target)






Indicator 7:

Water Users provided with new/ improved irrigation and/or drainage services (number)




Value

0

n.a.

360,612

476,662




Date achieved

01/31/2006

03/31/2014

03/31/2014

03/31/2016




Comments

Introduced with 2014 restructuring

Exceeded (132% of target)

Estimated percentage of female beneficiaries: 20 (same as target)





Indicator 8:

Operational Water User Associations created and/or strengthened (number)




Value

0

2,000

1,530

1,162




Date achieved

01/31/2006

03/31/2014

03/31/2014

03/31/2016




Comments

Elevated to PDO level with 2014 restructuring (previous Component 3, Indicator 1)

Partially achieved (76% of target)






Indicator 9:

Beneficiary farmers reporting improved access to adequate water and drainage services (%)




Value

n.a.

n.a.

50%

91%




Date achieved

01/31/2006

03/31/2014

03/31/2014

03/31/2016




Comments

Revised and elevated to PDO level with 2014 restructuring (previous Component 4, Indicator 1)

Exceeded (182% of target)






Indicator 10:

Yield of main crops (rice, maize, wheat, cotton, berseem) (tons/feddan) increase (%)




Value

0

n.a.

20%

15%




Date achieved

01/31/2006

03/31/2014

03/31/2014

03/31/2016




Comments

Revised and elevated to PDO level with 2014 restructuring (previous Component 2, Indicator 3)

Partially achieved (75% of target)






Indicator 11:

Direct Project Beneficiaries




Value

0

n.a.

1,000,000

2,262,900




Date achieved

01/31/2006

03/31/2014

03/31/2014

03/31/2016




Comments

Introduced with 2014 restructuring

Exceeded (226% of target)



Estimated 20% of female beneficiaries

(b) Intermediate Outcome Indicator(s) by Component

Indicator

Baseline Value

Original Target Values (from approval documents)

Formally Revised Target Values

Actual Value Achieved at Completion or Target Years

Component 1: Indicator 1

Quantity of water flowing in cross-regulators and intakes (m3/s)

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 1: Indicator 2

Quantity of water delivered to branch canals and mesqas

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 1: Indicator 3

Adoption of continuous flow

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 1: Indicator 4

Area where mesqas improvement is completed (feddan)

Value

0

n.a.

85,000 feddan

85,347 feddan

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Introduced with 2014 restructuring

Achieved (100% of target)



Component 1: Indicator 5

Area where new subsurface drainage systems are implemented (feddan)

Value

0

n.a.

4,000

n.a.

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Introduced with 2014 restructuring

Not informed



Component 1: Indicator 6

Area where subsurface drainage systems are rehabilitated (feddan)

Value

0

n.a.

118,760

92,085 feddan

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Introduced with 2014 restructuring

Partially achieved (77% of target)



Component 2: Indicator 7

Quantity of water used by farmers trained under the project one crop cycle after training completed (m3/ha/crop cycle)

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 2: Indicator 8

Value of production per m3 of water used

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 2: Indicator 9

Yield of main crop (wheat, cotton, rice, barseem)

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Revised and elevated to PDO level with 2014 restructuring (Indicator 3)

Component 2: Indicator 10

Farmers trained on irrigation, water saving and drainage techniques (number)

Value

0

n.a.

10,000




Date achieved

04/29/2005

03/31/2014







Comments

Revised with 2014 restructuring to improve original wording (Share of eligible farmers who have received training [%])

Component 2: Indicator 11

Area where marwa improvement is completed (feddan)

Value

0

n.a.

30,000 feddan

24,000 feddan

Date achieved

April 2005




March 2014

March 2016

Comments

Added with 2014 restructuring

Partially achieved (80% of target)



Component 2: Indicator 12

Area where land leveling was introduced (feddan)

Value

0

10,000 feddan

10,000 feddan

7,000 feddan

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Added with 2014 restructuring

Partially achieved (70% of target)

After demonstrations on land leveling, farmers were convinced and land leveling became part of their land preparation activities, and thus not computed on the project


Component 3: Indicator 13

Number of WUAs legally established

Value

0

2,000

1,530

1,162

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Elevated to PDO level with 2014 restructuring (Indicator 8)

Partially achieved (76% of target)



Component 3: Indicator 14

Number of WUAs and BCWUAs functioning one year after establishment

Value

0

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 3: Indicator 15

Cost recovery collections

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 3: Indicator 16

Equity = difference between head and tail yield for main crops

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring in favor of PDO Indicator 5 to assess equity of distribution

Component 3: Indicator 17

Number of established BCWUAs

Value

0

80

162

308

Date achieved

04/29/2005

03/31/2014

March 2014

March 2016

Comments

Introduced with 2014 restructuring

Exceeded (190% of target)



Component 3: Indicator 18

Number of established District level Water Boards (WBs)

Value

0

11

11

9

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Introduced with 2014 restructuring

Partially achieved (81% of target)



Component 3: Indicator 19

Number of established IWMDs

Value

0

11

22

22

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Introduced with 2014 restructuring

Achieved (100% of target)



Component 4: Indicator 20

Share of farmers in project area satisfied with administration of irrigation systems

Value

n.a.

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Revised and elevated to PDO level with 2014 restructuring (Indicator 9)

Component 4: Indicator 21

Implementation pace (actual vs planned disbursements)

Value

0

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 5: Indicator 22

Number of environmental (performance-based) monitoring/benchmarking systems in place and functioning

Value

0

n.a.







Date achieved

04/29/2005

03/31/2014







Comments

Dropped with 2014 restructuring

Component 5: Indicator 23

People in project area reached by awareness activities related to proper sewage and solid waste disposal and water quality impacts

Value

0

n.a.

50,000

59,400

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Wording changes with 2014 restructuring (original wording: Public awareness of quality of water in irrigation canals)

Exceeded (119% of target)



Component 5: Indicator 24

Solid waste collected and safety disposed (ton)

Value

0

n.a.

10

n.a.

Date achieved

04/29/2005

03/31/2014

03/31/2014

03/31/2016

Comments

Wording changed with 2014 restructuring (original wording: Tons of solid wastes collected and safety disposed to (pilot) landfills)

Not informed






Download 1.43 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   ...   12




The database is protected by copyright ©ininet.org 2024
send message

    Main page