Section
|
Subject
|
Page
|
1.0
|
Introduction
|
01
|
1.1
|
Background
|
01
|
1.2
|
Objectives of EA
|
03
|
1.3
|
Categorization
|
05
|
2.0
|
Legal Framework
|
05
|
2.1
|
Legal Requirements
|
05
|
2.2
|
Environmental Legislative Framework
|
06
|
2.3
|
Compliance with Environmental Related Policies in Bangladesh
|
06
|
2.3.1
|
National Environmental Policy, 1992
|
06
|
2.3.2
|
National Environmental Management Action Plan (NEMAP), 1995
|
07
|
2.3.3
|
Bangladesh Environmental Conservation Act, 1995
|
07
|
2.3.4
|
Environmental Conservation Rules, 1997
|
08
|
2.3.5
|
Environment Court Act, 2010
|
09
|
2.4
|
Implications of Policies and Environmental Clearance Procedure
|
09
|
2.4.1
|
Steps for Environmental Clearance Procedure for category Red project
|
10
|
2.5
|
World Bank Safeguard Policies(in case of WB funded project)
|
11
|
2.5.1
|
Environmental Policy OP 4.01( Environmental Assessment)
|
12
|
2.5.2
|
Environmental Screening
|
13
|
2.5.3
|
Application of DoE and WB policy 4.01
|
13
|
3.0
|
Detail Environmental Features
|
14
|
3.1
|
EIA Procedures
|
14
|
3.1.1
|
Criteria for Locating Industrial Plants
|
15
|
3.1.2
|
Baseline Studies
|
16
|
3.1.3
|
Setting the Boundaries of an IEE/EA by identifying significant issues
|
17
|
4.0
|
Methodology
|
20
|
5.0
|
Description of the Project
|
20
|
5.1
|
General
|
20
|
5.2
|
Options for Site Development
|
22
|
6.0
|
Master Plan
|
23
|
6.1
|
Project Development Process
|
25
|
6.1.1
|
Land Development plan by Dredge Soil
|
26
|
6.1.2
|
Building Design and Brief Specification
|
26
|
6.1.2.1
|
Structural Steel Building
|
26
|
6.1.2.2
|
RCC Service Core
|
27
|
6.1.2.3
|
RCC Frame Structure Buildings
|
27
|
6.1.2.4
|
Energy Efficiency with E-Glass cladding
|
27
|
6.1.2.5
|
Solar Panels and Green Technology for Buildings
|
27
|
6.1.2.6
|
Ceilings and Floors
|
27
|
6.1.2.7
|
Mechanical and Service space
|
28
|
6.1.2.8
|
Air Conditioning
|
28
|
6.1.3
|
Buildings and Installation of Electronic City
|
28
|
6.1.3.1
|
Administrative Building (BHTPA)
|
28
|
6.1.3.2
|
Multi-Tenant Building (MTB)
|
28
|
6.1.3.2.1
|
MTB’s facilities
|
28
|
6.1.3.4
|
The Incubator Building
|
29
|
6.1.3.5
|
Conference Hall
|
29
|
6.1.3.6
|
The Residential Buildings
|
29
|
6.1.3.7
|
The Dormitory Building
|
29
|
6.1.3.8
|
Social and Utility Buildings
|
30
|
6.1.3.9
|
Hotel Building
|
30
|
6.1.3.10
|
Convention Centre
|
30
|
6.1.3.11
|
Recreational Zone Vacant Spaces
|
30
|
6.1.3.12
|
Vacant Industrial Plots
|
30
|
6.1.3.13
|
Internal Roads
|
30
|
6.1.4
|
Off-site Infrastructure for Electronics City
|
31
|
6.1.4.1
|
Jetty Construction
|
31
|
6.1.5
|
Remarks on the Design Aspect
|
31
|
6.1.6
|
Rationale of the Project
|
31
|
6.1.7
|
Location of the Project
|
32
|
6.1.7.1
|
The Project Site
|
33
|
6.1.8
|
Ownership
|
34
|
6.1.9
|
NOC from Local Authority
|
34
|
6.1.10
|
Raw Materials
|
35
|
6.1.11
|
Outputs of the Project
|
35
|
7.0
|
Environmental Baseline
|
37
|
7.1
|
General
|
37
|
7.2
|
The Project Site
|
37
|
7.3
|
Environmental Background
|
39
|
7.3.1
|
Physical Environment
|
39
|
7.3.1.1
|
Topography
|
39
|
7.3.1.2
|
Location
|
39
|
7.3.1.3
|
Access Roads
|
40
|
7.3.1.4
|
Waterway through Katakhal River
|
40
|
7.3.1.5
|
Shape of Site
|
41
|
7.3.1.6
|
Earthquake Data
|
41
|
7.3.1.7
|
Roads
|
41
|
7.3.1.8
|
Railway
|
41
|
7.3.1.9
|
Airport
|
41
|
7.3.1.10
|
Landuse
|
41
|
7.3.1.11
|
Climate
|
41
|
7.3.1.12
|
Temperature
|
42
|
7.3.1.13
|
Relative Humidity
|
42
|
7.3.1.14
|
Rainfall
|
43
|
7.3.1.15
|
Cyclone
|
44
|
7.3.1.16
|
Earthquake
|
45
|
7.3.2
|
Biological Environment
|
45
|
7.3.2.1
|
General
|
45
|
7.3.2.1.1
|
Flora and Fauna
|
46
|
7.3.2.1.2
|
Surface Water Quality
|
48
|
7.3.2.1.3
|
Groundwater quality
|
50
|
7.3.2.1.4
|
Air Quality
|
50
|
7.3.2.1.5
|
Noise Level
|
50
|
7.3.2.1.6
|
Fisheries
|
51
|
7.3.2.1.7
|
Heritage and Archeology
|
51
|
7.3.2.1.8
|
Flooding
|
52
|
7.3.2.1.9
|
Transportation Facilities
|
53
|
7.3.2.1.10
|
Seismicity
|
53
|
8.0
|
Identification and Evaluation of Potential Impacts
|
54
|
8.1
|
General Overview of Environmental Impacts
|
54
|
8.1.1
|
Identification of Impacts
|
54
|
8.2
|
Pre-Construction Phase
|
55
|
8.2.1
|
Pre-Construction Phase Impacts
|
55
|
8.2.1.1
|
Positive Impacts during Pre-Construction
|
55
|
8.2.1.2
|
Adverse Impacts during Pre-Construction
|
56
|
8.2.1.2.1
|
Impact on Physical Environment
|
56
|
8.2.1.2.2
|
Adverse Impact on Biological Environment
|
56
|
8.3.
|
Impacts during Construction Phase
|
57
|
8.3.1.
|
Impacts on Physical Environment
|
57
|
8.3.1.1.
|
Water Quality
|
59
|
8.3.1.1.1.
|
Surface and Groundwater
|
59
|
8.3.1.2.
|
Drainage System
|
59
|
8.3.2.
|
Impact on Biological Environment
|
59
|
8.3.2.1.
|
Bio-diversity (Floral and Faunal)
|
59
|
8.4.
|
Operational Phase Impacts
|
59
|
8.4.1.
|
Impact on Physical Environment
|
59
|
8.4.1.1.
|
Impact on Air Pollution
|
60
|
8.4.1.2.
|
Impact on Noise Pollution
|
60
|
8.4.1.3.
|
Impact on Domestic Wastewater
|
60
|
8.4.1.4.
|
Impact on Effluent
|
60
|
8.4.1.5.
|
Impact on Geology
|
60
|
8.4.1.6.
|
Impact on Surface and Groundwater
|
61
|
8.4.1.7.
|
Impact on Disposal of IT Equipment
|
61
|
8.4.1.8.
|
Flooding
|
63
|
8.5
|
Social related Impacts
|
63
|
8.5.1
|
Employment Opportunity
|
63
|
8.5.2
|
Effects of e-Waste disposal
|
63
|
9.0
|
Public (Stakeholder) Consultation
|
64
|
9.1
|
Introduction
|
64
|
9.2
|
Methodology
|
65
|
9.3
|
Disclosure of Public Consultation
|
66
|
9.4
|
Summary of Public Consultation
|
66
|
10.0
|
Environmental Management and Mitigation Plan
|
69
|
10.1
|
Principles of EMP and Detail Plan
|
69
|
10.1.1
|
Applicable Safeguard Policies of the World Bank
|
69
|
10.2
|
Pre-Construction Phase
|
70
|
10.3
|
Construction Phase
|
71
|
10.3.1
|
Effects on Water, Air and Soil quality
|
71
|
10.3.2
|
Effects on Flora and Fauna, Ecosystems and Habitats
|
71
|
10.3.3
|
Effects on Noise and Emission
|
71
|
10.4
|
Implementation of the EMP
|
74
|
11.0
|
Organizational Management Aspects (Institutional Framework)
|
77
|
12.0
|
Environmental Monitoring Program for Performance Evaluation
|
79
|
12.1
|
Requirements for Management and Monitoring
|
79
|
12.2
|
Monitoring and Reporting in case of PSDSP
|
80
|
12.3
|
Monitoring Parameters and Schedule
|
81
|
12.3.1
|
Monitoring Indicators
|
81
|
12.3.1.1
|
Noise Monitoring
|
82
|
12.3.1.2
|
Water Quality Monitoring
|
82
|
12.3.1.3
|
Air Quality Monitoring
|
82
|
12.3.1.4
|
Direct Construction Impact Monitoring
|
82
|
12.4
|
Environmental Management and Monitoring Program
|
83
|
12.5
|
Environmental Management Budget
|
83
|
13.0
|
Institutional Capacity
|
84
|
13.1
|
Key aspects of the Study including the no. of Competency Staff
|
84
|
13.2
|
Availability of Appropriate Technology and Equipment
|
85
|
13.3
|
Monitoring Budget
|
85
|
14.0
|
Responsibility of the Contractor
|
85
|
15.0
|
Conclusion
|
88
|