Constructor: Fuzhou Urban Utility Development and Construction Company 1
Author: Guangzhou Research Institute of Environmental Protection 1
December 2004 1
Constructor: Fuzhou Urban Utility Development and Construction Company 1
1 General Provision 4
Role and Meaning of Building Two Roads and One Bridge 4
1.1 Assessment Purpose 5
1.2 Basis for Compilation 5
1.3 Assessment Range 6
1.4 Assessment Contents and Key Points 6
1.5 Laws and Regulations 7
1.7 Environment functional areas and implementation standard within the assessment area 8
1.8 Emission Standard 9
2 Project Description and Engineering Analysis 11
Status and Role of the Phase-II Project Of the Third Ring Road and Nanjiang Binlu in the Traffic Planning of Fuzhou 11
Road strike and interchanges 12
Design standard 13
Road cross section 15
Drainage system 16
Construction scale and investment 18
Traffic forecast 19
Analysis on emission of major pollutants 20
Construction schedule 23
Land occupied by construction site, material source and protective measures for construction environment 24
3 Overview of Natural and Social Environments Along the Project Line 27
3.1 Natural Environment 27
3.2 Fuzhou’s current social situation and planning 32
3.3 Development planning, traffic and environment planning of Fuzhou 34
3.4 Social Environment 46
3.5 General planning of Nantaidao Island 47
3.6 Nantaidao Island environment planning 49
3.7 Sensitive points of environmental protection 52
4 Assessment of Ecological Environment and Protective Measures 57
4.1 Terrestrial Ecological Environment 57
4.2 Current status of aquatic ecology at the Kuiqi River reaches 62
4.3 Status of Minjiang River Estuarine Wetlands 63
4.4 Major Animal Species in the Wetlands of the Minjiang River Estuary 65
4.5 Principle and Planning of Wetland Protection 79
4.6 Impact on ecologic environment and preventive measures 83
5 Current Status of Noise Environment Status, Impact Assessment and Mitigation Measures 88
5.1 Monitor and Evaluation on Current Noise Status 88
5.2 Analysis of noise impact during construction period and mitigation measures 93
5.3 Assessment of traffic noise impact in operating period 101
6 Ambient air Status, Impact Assessment and Mitigation measures 107
6.1 Monitoring and Assessment of Ambient air Quality Status 107
6.2 Ambient air Impact Assessment During Construction 114
6.3 Ambient Air Impact Assessment during Operation 115
7 Current Water Environment Status, Impact Assessment and Mitigation Measures 163
7.1 Assessment of current water environment 163
7.2 Analysis of Impact on Water Environment during the Construction Period 168
7.3 Assessment of Impact on Water Environment during Operation Period 176
7.4 Assessment of Risk of Accidents on the Bridge during the Operation Period 184
7.5 Measures for Water Environmental Pollution Control 189
8 Status, Assessment and Protection Measures for Cultural property along the Route 193
8.1 Cultural property 193
8.3 Impact of Nanjiang Binlu on Fanchuanpu Catholic Church and protection measures 196
8.4 Summary 196
9 Alternative Proposal and its Impact on Environment 197
9.1 Route Comparison and Selection for South Jiangbin Road 197
9.2 Route Comparison and Selection for the 3rd Ring Road (Phase II) 198
9.3 Proposal Comparison and Selection for Location of Kuiqi Bridge 200
10 Relocation and its impact on residents’ life 202
10.1 Policies and statutes about immigrants’ removal and resettlement 202
10.2 Estimated cost of resettlement and land acquisition for Nanjiang Binlu 202
10.3 Estimates of compensation of land acquisition, removal and resettlement of the Phase-II Project of the Third Ring Road 211
10.4 Estimates of compensation of land acquisition, removal and resettlement of Kuiqi Bridge 213
11 Public participation 214
11.1 Purpose and meaning of public participation 214
11.2 Investigation Method and Content 214
11.3 Public participation on Nanjiang Binlu 215
11.4 Public participation survey on the Phase-II Project of the Third Ring Road project 223
11.5 First public participation survey on the Kuiqi Bridge project 233
11.6 Summary of public opinions 243
12 Economic Evaluation and Environmental economic Gains and Losses Analysis 245
12.1 National Economy Assessment and Economic Gains and Losses Analysis of Nanjiang Binlu 245
Environmental Measurement 250
12.2 National Economy Assessment and Environmental Economic Gains and Losses Analysis of the Phase-II Project of the Third Ring Road 252
Environmental Measurement 257
12.2 National Economy Assessment and Environmental Economic Gains and Losses Analysis of Kuiqi Bridge 259
Environmental Measurement 264
12.4 Conclusion of Environmental Economic Losses and Gains Analysis 266
13 Plans for Environmental Management and Monitoring 268
13.1 Setup, personnel, arrangement and training of environment management department 268
13.2 Environmental monitoring plans 274
14 Assessment Conclusion and Suggestions 279
14.1 Role and significance of the construction of the Two Roads and One Bridge 279
14.2 Assessment and Protective Measures of Ecological Environment 280
14.3 Current status of noise environment, impact assessment and mitigation measures 285
14.4 Current status of ambient air quality, impact assessment and mitigation measures 285
14.5 Current status of water environment, impact assessment and mitigation measures 292
14.6 Impact upon the cultural property and the protection measures 295
14.7 Public participation 295
14.8 General Conclusion 296