Index harakevet part issues 70 87



Download 451.31 Kb.
Page3/5
Date19.10.2016
Size451.31 Kb.
#4901
1   2   3   4   5
ISRAEL SALT CO. ATLIT.

Loco restored. 81:11. (& 83:10:(f).)
JAFFA.

Restoration of former station area. Nov. 2005. 71:06:(p).

Tender for restoration of ‘Manshiya’ station, with LRV. 72:06:A:(iii).

Note on wagons preserved at station - & Paul Cotterell. 79:07:(a).

Conversion of station to cultural centre. 80:04(f).

Memorial track length to Terezina in pavement. 84:07:(f).

Jaffa-Jerusalem Book, Tony Travis. 84:07:(a).

Visit to restored station, May 2009. 85:07:(c).
JERUSALEM. (See also Light Railway Schemes; also Modi’in.)

Tramway works. pictures. 70:01

Jerusalem line - photo of IC3. 70.03

Jerusalem Day’ June 2005 special “first fruits” train. 70:04:(g).



Photo of special. 70:17.

New A1 Line: Bridges at Latrun, contract. 70:04:(k).

Decision on fast line approved. 70:04:(n).

Overcrowding on trains, April 2005. 70:04:(s).

Tramway notes. 70:07.

Jerusalem line closed from Beit Shemesh for works. 71:04:(d).

More discussion on A1 links. 71:04:(q).

Note on low passenger useage. Nov. 2005. 71:06:(r).

Tender for more underline bridges on Beit Shemesh section 72:05:(vi).

Note on site of Sejed station. 72:07:(g).

Fare reduction attempt to increase patronage. 73:04:(xxii).

Tender for Jerusalem new Station. 73:05:(i).

Additional services. 74:03:(vi):(e).

Stone-laying for new station. Sept. 2006. 74:03:(x).

Splitting of service. 75:03:(k).

New station to act as bunker also. 76:04:(c).

Worries & Bids on new line. March 2007. 76:04:(m).

Aerial View of Jerusalem Station. 1994 79:01.

Explosive building works for new station. 79:04:(f).

Contract with Voest for new line Section 3. 79:04:(n).

Realignment of line near Wadi Sarar. 80:04:(j) & 80:14 (photo).

Plan to build road on former trackbed to station. 81:04:(o).

Environmental Problems on new line. 81:04: (d),(k),(l), 82:04:(d) & 83:04:(b)

Tendering & Work starts on new station. 82:04:(t) & 82:05:(xii)..

Yad Vashem railway exhibits. 84:07:(e).

Trackworks at Nahal Soreq on old line. 2009. 84:04:(g).

Progress on new line, Tender for sections B & C 85:04:(b), (h), (), (u).

Tender acceptance for Eastern Tunnels on A1 line. 87:04:(iv).

Note on tunnelliung under Jerusalem. 87:04:(xxii).
JEZREEL VALLEY.

Arguments, Heavy v. Light Rail. 2009. 87:04: (xxii).
JORDAN. (See Hejaz & Aqaba Railways.)

Plan for new lines. 2008- 83:07:E.
JUNCTION STATION. (Wadi Sarar).

Article on station 1912 & 1917, with WW1 maps. 77:10.
KATINKA. Baruch. See “From Then Till Now.”
KFAR SABA.

Link to Herzliyya plans. 72:04:(xii).

Photo of Sokolov station under construction. 72:11.

Kfar Saba Merkaz Opening, September 2006. 74:03:(v).
KFAR SZOLD.

Hand-worked Decauville. 77:13.
KFAR YEHOSHUA.

Note. cf. 45:18. 72:07:(b).

Note on Emergency Loco Shed. 75:07:(h).
KIRBY. ARTHUR.

Article, 1948. 70:16.
KIRYAT ARIEH. (Petah Tikva).

Work on new station advanced. 75:03:(i).

Photo of new station under construction. 78:07.

Station Opens. 03.05.2008. 82:04:(i).
KIRYAT HAROSHET HALT.

Correspondence from 1936. 76:11.

Note on location. 77:07:(g).
KIRYAT MOTZKIN.

Noise pollution measures. 2007. 78:04:(q).
KOTSO SHEL YUD.

Epic Poem. Yehudah Leib Gordon. 80:12.
KUWAIT.

DB loco in DB advertising livery. 80:07:I.

Involvement in operation of railways in Ethiopia. 82:07:(c).

Railway to link Saudi Arabia & Iraq – proposal. 83:07:D. & E.
LEBANON.

Report on Bill Alborough visit to Beirut. March 2006. 73:08:E.

Report on visit April 2005 (Neidhart). 78:08:B.

Report (Fahrplancenter News) on Infrastructure. 79:08:B:(i)

Plans for new international links - works from 2005 to 2010? 79:08:B:(ii).

Beirut St. Michel station. Photo. 80:01.

Photos of rusting rolling-stock in Beirut. 84:15. (Rear cover).

SLM Works situation. 2009. 87:11:(ii).



LEHAVIM.

Station renamed Lehavim-Rahat. 2007. 78:04:(x).

Report on station opening, June 2007. 79:04:(a).
LEVEL CROSSINGS.

Accident at Revidim, June 2005. 70:04:(a).

Accident at Ahuzam, July 2005. 70:04:(b).

Fatality at Binyamina, July 2005. 70:04:(c).

Traffic Police actions. 70:04:(d).

Beit Yehoshua accident, August 2005. 70:04:(e).

Tender for grade separations on Kiryat Gat-Beersheba line. 70:06:(viii).

Tender for grade sparations Naan-Kiryat Gat line. 70:06:(xiii).

Tender for grade separation at Rafael crossing, Akko line. 70:06:(xv).

Level crossing accident at Binyamina. Dec.2005. 72:04:(i).

Announcement on Grade Separation works. 72:04:(ii).

Procedure for Agricultural Crossings. 72:04:(iii).

Level Crossing Safety Campaign. Jan. 2006. 72:04:(iv).

More on Binyamina crossings problems. 72:04:(v).

Conference for managers of grade separation works. 72:04:(li).

Tender for grade separations, Akko-Nahariyya line. 72:05:(i).

Level Crossing Inspectors appointed. 73:04:(xv).

Instruction to increase safety at level crossings. 73:04:(xxi).

Accident at Beit Yehoshua. June 2006. 73:09a. (Stop press.)

Fuller Report on Beit Yehoshua smash. 74:03:(i).

Tender for grade separation near Pardess Hana. 74:04:(iii).

Tender for grade separation at Binyamina South. 74:04:(iv).

Tender for detecting obstacles at level crossings. 74:04:(ix).

Safety project, detection systems to be installed. 75:03:(b).

Tender for two grade separations in Tamar region. 75:05:(xix).

Tender for grade separation near Givat Koakh. 75:05:(xx).

Tender for grade separation near Netanya. 75:05:(xxi).

Tender for grade separation near Rehovot. 75:05:(xxii).

Problems with level crossings in 1946! 75:07:(c).

Arrest of L.C. Guards, January 2007. 76:04:(a).

Proposal to arrest Linchevski over negligence. 76:04:(a).

Tenders, grade separations near Beit Shemesh & Ashkelon line. 76:04:(a).

Briefing on roads and driver problems. 76:04:(b).

Tender for grade separation Akko-Nahariyya line. 76:05:(v).

Tender for grade separation nr. Kfar Habad. 76:05:(xi).

Bus driver stupidity - near miss at Ashdod, 2007. 77:04:(c).

Radar schemes, detection, & bridge construction. 2007. 77:04:(g); (i); (k); (l); (m)..

incl. driver stupidity, Tenders for Maagan Michael, Ramla, Hartuv.

Tender for grade separation, Nahal Soreq. 77:05:(i).

Grade separations at Rehovot. 2007. 78:04:(d).

Human Barriers and their effectiveness. 78:04:(j).

Accident at Aroer. August 2007. 78:04:(p).

Road bridge for Binyamina. 78:04:(v).

LC Radar at Haifa. 78:04:(s).

Radar installation near Ramla. 80:04:(h).

Works on Ashdod – B’nei Darom road. 80:04:(d).

Resurfacing problems, near Ben Gurion. 81:04:(q).

More radars, incl. Near Hutzot HaMifratz. 81:04:(b).

Tender for LC watchmen. 2008. 81:05:(vii).

LC Guard near Atlit beaten up by Arabs. July 2008. 82:04:(r).

Collision Avoidance & Alert gadget developed. 83:04:(f).

Grade Separations at Binyamina & Haifa. 83:04:(h), (i).

Updated criteria for employment of watchen. 85:04:(l).

Grade separation at Hulda. May 2009. 85:04:(m).

248 cases of breaking barriers in 2008. 85:04:(s).

Level Crossing Day. 25.06.2009. 85:04:(w).

New road bridge at Netanya. 2009. 86:04:(xvi).

Grade Separation at Kfar Vitkin. 2009. 87:04:(xxvii) & photo 87:03.

LC accident at Kiryat Gat, 27.12.2009. 87:04:(xxix).

New Grade Separation at Atlit. Nov. 2009. 87:04:(xviii).

LIBYA.

Tripoli – Misratah line construction suspended 2007. 81:07:F.

Chinese firm to take over. 81:07:G.

Russians constructing line from Surt to Benghazi. 2008. 84:08:B.

China to build 172km. Line. Jan. 2009. 86:07:D.

Delivery of new diesel locos from USA, 2009. 87:10:E.
LIGHT RAILWAY SCHEMES.

Jerusalem.

Signature on financial agreements, July 2005. 70:07:(a):(i).

Jerusalem, Bridge. 70:07:(a):(ii).

Tests on high-capacity buses. 70:07:(a):(iii).

Construction permits request by CityPass. 72:06:B:(i).

Finance Agreement. 72:06:b:(ii).

Approval of bridge design. 73:06:A:(i).

Removal of statue to make way for station construction. 73:06:A:(ii).

Setting of opening date, Jan. 2009. 74.:05:A:(i).

Article on problems and financial issues. 74:05:A:(ii).

Tracklaying starts. 75:06:B.

Photo of tracklaying at Mount Herzl. 75:13.

First LRV driven at Alstom in La Rochelle, France. 76:06:B.

Assembly of Calatrava Bridge. 77:06:A:(i).

Veolia & Israel Electrical Co. - to electrify network. 77:06:A:(ii).

Problems with Roadworks, article. 77:06:(A):(iii).

Calatrava bridge lit up. Yom Yerushalayim. 77:06:(A):(iv).

Article on controversies. 78:06:(A):(i).

Article on problems with tracklaying. 78:06:(A):(ii); (iii).

Municipality blamed for delays. 78:06:(A):(iv).

Erection of bridge mast. August 2007. 78:06:(A):(v).

Photo of erection of bridge. 78:12.

Worries of businesses. 79:06:A:(i).

More Tracklaying problems. 79:06:A:(ii).

Bureaucratic issues on bridge construction. 79:06:A:(iii).

Calatrava Bridge mast completion. Jan. 2008. 80:06:B.

Calatrava Bridge construction, photos. 80:14.

Cracks discovered at base of bridge. 81:06:B:(i) & 82:06:().

Arguments over Tracklaying, 2008. 81:06:B:(ii).

Tracklaying report. 81:06:B:(iii).

First trams arrive at French Hill. 81:06:B:(iv) (& photos).

Budget overshot and threats to halt. 81:06:B:(v).

Dismay at slow progress. 82:06:(Jer.b).

Bridge opened June 2008. 82:06:(Jer.c).

Terror attack with bulldozer. July 2008. 82:06:(Jer.d).

Jaffa Road tracklaying. 82:06:(Jer.e).

Resignations of City Pass General Manager etc. 82:06:(Jer.e).

More delays and complaints, Sept. 2008. 82:06:(Jer.f).

(Jerusalem-liveried tram in Vienna). 82:07:(b).

Photo at Depot. 82:11.

Annual Conference of Public Transport Operators. Oct. 2008. 83:06:(a).

Agreement on testing the Bridge. 83:06:(b).

Tracklaying in Jaffa Road. 83:06:(c).

Bus Feeder services. 83:06:(d).

Photo of Bridge with weight testing. 83:11.

More political squabbles. 2008. 83:06:().

Sweden – anti-Israel feeling re. Veolia’s involvement. 84:04:(k).

Photos of trackworks in Jaffa Road. Feb. 2009. 84:03.

Information Boards erected. 84:06:A:(i).

City Arguments about speeding up construction. 84:06:A:(ii).

Anti-Tram Feeling amongst population. 84:06:A:(iii).

Details on surfacing materials. 84:06:A: (iv).

Formal acceptance of Calatrava Bridge Feb. 2009. 84:06:A:(v).

Financial Danger of cancelling whole project. 84:06:A:(vi).

Editorial comment on Mismanagement of scheme. 84:06:A:(vii).

Optimism on further construction. 85:06:B.

Photo of tracklaying on Calatrava Bridge. 85:01.

Photo of tracklaying. 87:13.

Speeding up the work. Oct. 2009. 87:06:A:(i).

Final Phase of construction and testing beginning. 87:06:A:(ii).

Politics and threatened Palestinian boycott. 87:06:(iii).

Appitrack machine returns home. 87:06:(iv).

Photos of tracklaying. 87:13.
Tel Aviv.

Arguments on tunnelling. 70:07:(b):i).

Bidding delays. 70:07:(b):(ii).

Green Line conflicts. 70:07:(b):(iii).

Selection of Consortia. 72:06:(A):(i).

Interview with Chairman of NTA. 72:06:(A):(ii).

Refurbishment of Jaffa station. 72:06:(A):(iii).

Tenders submitted. February 2006. 72:06:(A):(iv).

Map of Red Line. 72:12.

Visit by Mofaz to NTA offices. 73:06:B.

Down to only two competitors, Metro-Rail & MTS. 74:05:B.

Article on mistakes in traffic forecasts. 75:07:(A):(i).

MTS win the bids. 75:07:(A):(ii).

Map of planned network. 75:07:A.

Metro-Rail appeals against MTS win. 75:07:A:(iii).

Legal argument over land acquisition in Jaffa. 76:06:(A):(i).

New General Manager for MTS. 76:06:(A):(ii).

MTS had invested $20M in bidding. 76:06:(A):(iii).

Concession signed with MTS. May 2007. 76:06:(B):(i).

BOT Concession data and schedules. 76:06:(B):(ii).

Preparation works on Jerusalem Ave. 76:06:(B):(iii).

Works on Red Line commence. August 2007. 78:06:B.

Roadworks start May 2007. 79:06:B:(i).

Concession signed. 79:06:B:(ii).

Problems over land expropriation. 79:06:B:(iii).

Payments issues. 80:06.A:().

Municipal Obstructionism to Elevated Lines. 80:06:A:(ii).

Beit HaOsef removed. 81:06:A:(i).

Demolition works along alignment. 81:06:A:(ii).

Financial threat to project’s continuation. 81:06:A:(iii).

Work starts on cutting at Jabotinsky. 82:06:TA:(a).

Master Plan signed. July 2008. 82:06:TA:(b).

Financial Guarantees presented by MTA. 84:06:B.

Debut of Siemens Avenio tram. 85:06:A.

Protecting paved track, Aug. 2009. 86:06:(i).

Trial Runs at last. 86:06:(ii).

Fern Express’ article on construction. 86:06:(iii).



Financing issues and concession. 86::06:B
Haifa.

Matronit System: (Articulated buses!) 80:06:C.
LRT Systems in Iran.

Projects in Esfahan, Mashhad, Shiraz, Ahwaz, Karaj, Tabriz.83:07:K.
LRT SYSTEMS IN TURKEY.

Review of projects in Konya, Eskisehir, Bursa, Istanbul. 83:07:L

Köln and Skoda Stadtbahn vehicles for Istanbul, 2008. 83:07:J:(ii).
LUDD JUNIOR.

Further notes. (cf. 61:10). 72:07:(a.

Further notes on this and ‘Lydda North’. 74:06:(f).
MAMSHIT.

Tender for upgrading and extending tracks. 72:05:(xv).
MISHMAR HA’EMEK.

Manure trolley Decauville line. 73:07:(a).

Note on the ‘Bullshit Railway’. 74:06:(b).
MODELLING.

Report on findings at Köln Exhibition 2009. 87:12.
MODI’IN.

Tender for two tunnels on Ben Gurion-Modi’in line. 70:06:(xiv).

Photo of bridge on line. 70:12.

Progress on line. Report, Dec, 2005. 72:04:(xviii).

More progress on construction. 73:04:(xii).

More progress on line construction, October 2006. 75:03:(e).

Photo of viaduct construction. 78:01.

Photo of viaduct construction. 78:03.

Opening of Line. Sept. 2007. 78:04:(l).

Opening to Modi’in Outskirts (Patey Modi’in). 78:04:(m).

Patey Modi’in Press Run before Opening report. 79:04:(b).

Problems of Bus services & Parking at station. 79:04:(j).

Formal Opening of Modi’in Central Station. Proposals. 79:04:(k).

Facilities for Hard-of-Hearing installed. 79:04:(l).

Opening Date set for 22.09.08 80:04:().

Opening 01.04.2008. 81:04:(h).

Modi’in Train failure near Ben Gurion. 81:04:(n).

Notes on Opening, Problems, Traffic. 82:04:(e),(f).

Roadworks at Pa’atei Modi’in 2009. 85:04:(j).


Download 451.31 Kb.

Share with your friends:
1   2   3   4   5




The database is protected by copyright ©ininet.org 2024
send message

    Main page