The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page52/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   48   49   50   51   52   53   54   55   ...   82

1.39Site 47




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

47




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

24/2/2011

1

Name of dumpsite

Biladjari, west coast of Boyuk Shor lake 2

2

Coordinates

40 27 02,1

49 51 18,3



3

Settlements which use the dumpsite

Biladjari

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Binagadi

5

General description of the situation in the dumpsite

Large dumpsite which construction and construction waste curried by trucks, illegall shorting takes place

6

Total years of operation of the dumpsite

8

7

Date of initiation

2003

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

400 m x 200 m = 80,000 m2

11

Type of waste disposed (define with percentages)

60% construction waste, 30% household waste, 5% paper , 5% wood (H)

12

Municipal waste, wastewater treatment sludge, sewage water

No

13

Inert and bulky

Yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Illegal shorting takes place

17

Total volume (m3)

80,000 m2 x 0,5 m = 40,000 m3

18

Total quantity (tn)

13,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Deposition, temporary cover takes place

20

Quantity of gas generated

No

21

Bedrock (main formation)

Clays and loams. Impermeable formation (Quaternary)

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Level area nearby lake

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Impermeable

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

>10 m

26

Site Distance from:

R

27

Settlements, schools, working places

200 m , 1700, < 15 m

28

Stream with permanent flow

10 m

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

8 km

33

Other (describe)




34

Existing infrastructure

Town infrastructure

35

Fencing

Yes

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

Among 15 biggest dumpsites

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

No

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 10 yrs

48

Use of the receptor (no use, irrigation, drinking-recreation)

An aquidart

49

Sensitivity of the receptor (low, medium, high)

Medium

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

Medium

51

Other information

-



Photograph 39: Site 47


Download 4.64 Mb.

Share with your friends:
1   ...   48   49   50   51   52   53   54   55   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page