Attachment 2 LIST
Instruction (8).
-
Energy sector installations:
(a) Central Heat and Power Plants, Heating and power stations, Hydro-electric stations (ТЭЦ, ТЭС, ГЭС);
(b) Industrial installations to produce electricity, steam and hot water;
(c) pipelines ensuring supply of gas, oil, oil products, and heat;
(d) high-voltage electricity transfer lines;
(e) oil and oil products, gas, and solid fuel storages;
(f) ash and slam heaps.
-
Water reservoirs.
-
Oil, oil products and gas extraction and processing enterprises;
-
Building materials production (cement, asphalt, slate, asbestos pipes, etc.).
-
Agriculture and forestry:
а) agricultural intensification projects;
б) rural land ownership organization and reorganization projects;
в) water resources for agricultural purposes management projects;
г) land re-cultivation projects to change land use type;
д) poultry, husbandry and fishery complexes;
е) land reclamation projects;
ж) new forest plantations projects;
з) sanitary cutting-down and rehabilitation projects;
и) lumber stockpiling projects.
-
Mining industry:
а) exploration and operation works;
б) mineral resources mining (marble, basalt, salt, sand, gravel, clay and others);
в) coal mining;
г) ore mining;
д) ore processing;
е) production of non-ferrous, rare and precious metals;
ж) waste utilization and landfilling, including hazardous and toxic waste.
-
Metal-processing industry:
а) machinery production;
б) semi-conductive materials production;
в) enterprises on repair of aviation and rAiylway transportation;
г) radio and TV equipment production.
-
Glass production.
-
Production of pharmaceutical, biological and protein medicines.
-
Chemical production.
-
Food industry:
а) production of fat and oils;
б) production of meat and diary products;
в) sugar production;
г) tobacco production.
-
Textile, leather, and pulp industry:
а) primary wool and skin processing;
б)production of pressed wood boards, cardboards, etc.;
в) leather production;
г) paper production;
Attachment 3 LIST of activity types not requiring EIA
Instruction (8).
-
Routine repair.
-
Building interior works.
-
Small construction within the general plan, which has previously undergone EIA.
-
Inventory and environmental monitoring plans.
-
Research and development not causing any environmental damages or dangers.
-
Acquisitions not requiring activities negatively influencing the environment.
-
Construction of houses and social-cultural objects, engineering communications of which do not have harmful environmental effect (are connected to central heating, water supply and sewage pipes).
Appendix C Kyrgyz Republic – Second Village Investment Project: Environmental Training and Capacity Building Plan
Target Constituencies |
Needs
|
Methods
|
Schedule and Representative Costs
|
LIC Members, State Environmental Inspectors (Raion level) (1), Public Environmental Inspectors (2)
|
1. Capacity to understand environmental issues related to project design and operation, possible cumulative and residual impacts of multiple projects, basic elements of project monitoring
2. Understanding of the VIP-2 and SAEPF requirements and process for environmental screening, review and monitoring
|
Seminar/Workshop of three day duration with ½ day site visit to a representative project
Two day workshop with ½ day case study/site visit
|
Pilot phase: One workshop for approximately 40 participants
Total Cost: US$ 4,100.
Operational Phase: Regional workshops at 3-4 month intervals for 40 participants each over the project lifespan until all participating AOs and raions are trained
Total Cost: US$ 60,000.
|
VIP-2 Project Officers and HQ Staff
|
1. Understanding of VIP-2 and SAEPF requirements and process cycle for environmental screening, review or assessment, and monitoring
|
Two day workshop with ½ day case study/site visit
|
One time training for project officers during the pilot phase
Total Cost: US$ 4,600.
New staff and refresher training at yearly intervals during project implementation (3)
Total Cost: US$ 21,160.
|
VIP-2 Contractors/NGOs engaged for EA
|
1. Understanding of VIP-2 and SAEPF requirements for environmental review, assessment, mitigation, development of environmental management and monitoring plans
|
Provision of VIP-2 Guidelines and SAEPF Guidelines for EA preparation.
One day orientation workshop
|
One workshop during pilot phase
Total Cost: US$ 4,850.
Four workshops during the operational phase.
Total Cost: US$ 22,310.
|
Share with your friends: |