The ministry of economic development of the republic of azerbaijan rehabilitation and closure of unauthorized dump sites in the greater baku area environmental



Download 4.64 Mb.
Page41/82
Date06.08.2017
Size4.64 Mb.
#27742
1   ...   37   38   39   40   41   42   43   44   ...   82

1.28Site 32




Unauthorised Dumpsites Questionnaire - Greater Baku Area




Dumpsite Code

32




Person who conducted the survey

Prof. Dr. Theologos Mimidis




Date of the survey

18/01/2011

1

Name of dumpsite

Qobustan (Garadagh region)

2

Coordinates

40 05 41,8

49 25 14,7



3

Settlements which use the dumpsite

Qobustan village and settlements

4

Municipality (-ies) or local authority (-ies) which use the dumpsite

Municipality of Garadagh

5

General description of the situation in the dumpsite

Old quarry of earthy materials with irregular surface due to excavations

6

Total years of operation of the dumpsite

25

7

Date of initiation

1986

8

Date of closure

-

9

Years after closure (<15, 15< and <40, >40)

-

10

Area of dumpsite (in 1.000m2)

250 m x 350 m = 87,500 m2

11

Type of waste disposed (define with percentages)

75% household waste, 20% construction, demolition and quarry tailings, 5% used auto car tires (M)

12

Municipal waste, wastewater treatment sludge, sewage water

Yes, no , no

13

Inert and bulky

No, yes

14

Green and agricultural

No

15

Medical waste, toxic waste, slaughter house waste

No

16

Other (describe)

Household waste is carried to the site by big and small trucks , shorting is taking place in small scale

17

Total volume (m3)

87,500 m2 x 0,5 m = 43,750 m3

18

Total quantity (tn)

15,000 tn

19

Disposal method (describe: dispersion, incineration, compaction, temporary cover frequency)

Dispersion, deposition, incineration, compaction

20

Quantity of gas generated

Small quantity of gas

21

Bedrock (main formation)

Limestone, sand with clay interbeds (aquifuge)

22

Morphology of area (stream, valley, mountainside, level area, pit, quarry, other)

Old quarry

23

Hydraulic conductivity of capping (impermeable, moderate, free flow)

-

24

Hydraulic conductivity of bedrock (impermeable, moderate, free flow)

Moderate

25

Distance from the aquifer (>10m, 2-10m, <2m, in the aquifer)

< 2 m

26

Site Distance from:

I

27

Settlements, schools, working places

No schools, 100 m from working places, 120 from settlements. Next to M3 Buku Highway road.

28

Stream with permanent flow

45 m

29

Forest

No

30

Agricultural activities, pastures

No

31

Wells / boreholes

No

32

Sea shore

420 m

33

Other (describe)

4.6 km from Qobustan recreation area with petroglyphics

34

Existing infrastructure

M3 highway, gas and water pipes

35

Fencing

Yes from the part next to the highway (stonewall)

36

Guard-house

No

37

Lining or collection of leachate

No

38

Fire safety measures - fire belt

No

39

Other (describe)

One of the 15 biggest dumpsites

40

Nuisances and Hazards

Yes

41

Odors and dust

Yes

42

Wind blown materials

Yes

43

Birds, rats, vermin, insects

Yes

44

Fires

Yes

45

Rainfall values (<100mm, 100-200mm, >200mm)

100 – 250 mm

46

Stream flow (if applicable) through the site

No

47

Flood potential (1 in 10yrs, 1 in 50, 1 in 100)

1 in 100 years

48

Use of the receptor (no use, irrigation, drinking-recreation)

Aquifuge

49

Sensitivity of the receptor (low, medium, high)

High

50

Expected impacts on the environment (e.g. odours, pollution of receptors, fires etc)

High

51

Other information

It has to be abolished



Photograph 28: Site 32



Download 4.64 Mb.

Share with your friends:
1   ...   37   38   39   40   41   42   43   44   ...   82




The database is protected by copyright ©ininet.org 2024
send message

    Main page